**1.0 Job Overview**
The E&I Construction Planner is responsible for developing, managing, and controlling the detailed execution schedule for all Electrical and Instrumentation activities during the onshore fabrication of platform modules. The primary objective is to ensure the timely and efficient completion of all E&I work within the modules at the yard, maximizing the level of pre-commissioning and completeness to minimize costly offshore hook-up and commissioning work. This role is pivotal in transitioning the project from engineering design to physical construction.
**2.0 Key Responsibilities**
**2.1 Onshore Fabrication Planning & Scheduling**:
- Develop the Level 4 (execution) schedule for all onshore E&I construction activities, fully integrated with the overall module fabrication schedule.
- Break down the E&I scope of work into discrete activities based on the **Work Breakdown Structure (WBS)** and **Module Breakdown Structure**.
- Plan the sequence of E&I installation within each module, considering structural and piping progress to avoid clashes and ensure access.
- Key activities to schedule include:
- Installation of main electrical equipment (switchgear, transformers, MCCs) onto their skids and foundations.
- Installation of cable tray, conduit, and supports.
- **Cable pulling** (a major bulk activity requiring significant manpower planning).
- **Cable terminations** at equipment and junction boxes.
- Installation of instruments, control valves, and local panels.
- **Module-to-module interconnect** wiring and cabling.
- **Onshore pre-commissioning** activities (point-to-point checks, loop checks, meggering, insulation resistance testing).
**2.2 Resource & Manpower Loading**:
- Estimate manpower requirements based on quantities taken from drawings (e.g., meters of cable, number of terminations).
- Load resources (craft labor, supervisors) into the schedule to forecast peak demands and identify needs for specialized crews (e.g., termination teams).
- Work with construction management to ensure manpower plans are achievable and align with yard hiring strategies.
**2.3 Material & Procurement Integration**:
- Work closely with the procurement team to align the delivery of **Major Equipment** (e.g., switchgear, control systems) and **Bulk Materials** (cable, cable tray, instruments) with the construction schedule.
- Plan for the timely availability of all materials within the module work areas to support continuous workflow.
- Schedule receiving inspection and material handling activities.
**2.4 Interface Management**:
- Coordinate intensely with other discipline planners (**Structural, Piping, Mechanical**) to manage spatial and sequential dependencies within the congested module environment.
- _Example: Cable tray cannot be installed until structural steel and major piping runs are in place._
- Liaise with the **Engineering team** to ensure timely resolution of Technical Queries (TQs) and design changes that could impact the schedule.
- Interface with the **Pre-commissioning/Commissioning** team to ensure the schedule allows adequate time for testing before module load-out.
**2.5 Progress Measurement & Reporting**:
- Establish a system for measuring physical progress (e.g., earned value, % complete based on quantities installed).
- Collect progress data from field engineers and superintendents and update the schedule weekly.
- Generate detailed reports on schedule performance, critical path analysis, and look-ahead schedules for construction management.
- Identify potential delays early and propose mitigation plans or recovery schedules.
**2.6 Safety and Quality Integration**:
- Ensure the schedule allows adequate time for safe work practices, tool-box talks, and quality control inspections (e.g., hold points for inspection of cable terminations).
- Participate in constructability reviews to ensure the planned sequence is safe and efficient.
**3.0 Qualifications and Experience**
**Essential**:
- **Experience**: Minimum of **2-5 years** of experience in a planning role, with a **strong background in E&I construction within an onshore fabrication yard serving the offshore oil & gas industry**.
- **Technical Proficiency**: Expert-level knowledge of **Primavera P6** is mandatory. Advanced skills in MS Excel are required.
- **Field Knowledge**: Must have a practical understanding of construction methods for E&I systems within a modularized environment. Direct field experience is highly valued.
- **Blueprint Reading**: Exceptional ability to read and interpret construction drawings, including P&IDs, Single Line Diagrams, Loop Diagrams, and Cable Block Diagrams.
**4.0 Key Competencies**
- **Analytical Thinking**: Ability to deconstruct complex module designs into executable tasks.
- **Proactive Communication**: Excellent skills to liaise between engineering, procurement, yard management, and the construction crew.
- **Problem-Solving**: Ability to anticipate and resolve logístical and
-
Planner
3 days ago
Pasir Gudang, Malaysia Hiredly X Full timeAnalyze demand/forecast order from customer to determine required capacity. Make sure that the production plan is aligned with raw material to guarantee maximum efficiency in order to timely delivered products to customers' place. Release and ensure proper production plan schedule in order to fully utilize existing machine to their optimum and track plan...
-
Production Planner
2 weeks ago
Pasir Gudang, Malaysia MINDE Group Full timeAccomplishes manufacturing staff results by communicating job expectations; planning, monitoring, and appraising job results; coaching, counseling, and disciplining employees; initiating, coordinating, and enforcing systems, policies, and procedures in manufacturing. - Manages the scheduling and timeliness of the production process to ensure the company...
-
Production Planner
1 week ago
Pasir Gudang, Malaysia MINDE Group Full timeAccomplishes manufacturing staff results by communicating job expectations; planning, monitoring, and appraising job results; coaching, counseling, and disciplining employees; initiating, coordinating, and enforcing systems, policies, and procedures in manufacturing. - Manages the scheduling and timeliness of the production process to ensure the company...
-
Project Planner
1 week ago
Pasir Gudang, Malaysia Asgard Resources Sdn Bhd Full time**Role Summary** We are seeking a detail-oriented and proactive Project Planner to lead the planning, scheduling, monitoring, and reporting activities across all phases of project execution. This role is vital in ensuring that projects are delivered on time, within scope, and aligned with contractual obligations. The planner will work closely with project...
-
Planner
3 days ago
Pasir Gudang, Malaysia Masimo Full time**Job Summary**: The Planner will assist in the Quarterly, Monthly and Daily planning processes to help ensure optimal plans are established for the manufacturing of products such that materials can be purchased, arrive as desired and manufacturing is able to build the right product at the right time to ultimately fill customer orders on time in the most...
-
Production Planner
7 days ago
Pasir Gudang, Malaysia MINDE Group Full timeAccomplishes manufacturing staff results by communicating job expectations; planning, monitoring, and appraising job results; coaching, counseling, and disciplining employees; initiating, coordinating, and enforcing systems, policies, and procedures in manufacturing. - Manages the scheduling and timeliness of the production process to ensure the company...
-
Planner
1 day ago
Pasir Gudang, Malaysia Masimo Full time**Job Summary**: Under the direction of the Supply Chain Manager, the Planner will assist in the Quarterly, Monthly and Daily planning processes to help ensure optimal plans are established for the manufacturing of products such that materials can be purchased, arrive as desired and manufacturing is able to build the right product at the right time to...
-
Planner
1 day ago
Pasir Gudang, Johor, Malaysia Masimo Full time 60,000 - 120,000 per yearDescriptionJob Summary:The Planner will assist in the Quarterly, Monthly and Daily planning processes to help ensure optimal plans are established for the manufacturing of products such that materials can be purchased, arrive as desired and manufacturing is able to build the right product at the right time to ultimately fill customer orders on time in the...
-
Global Maintenance Planner
1 day ago
Pasir Gudang, Malaysia Puma Energy Full timeMain Purpose: The Maintenance Planner is primarily accountable for developing and executing maintenance plans that address immediate equipment, facility and system maintenance needs and ensuring mínimal downtime and quick resolution to maintenance issues to keep our operations running reliably and at optimal performance. Knowledge Skills and Abilities, Key...
-
Planner, Preventive Maintenance
1 week ago
Pasir Gudang, Malaysia URC Snack Foods (M) Sdn Bhd Full time**Asset Management and Maintenance Planning**: - Prepares maintenance plan of each piece of equipment in the plant using criticality analysis. - Schedules maintenance activities by preparing necessary resources such as spare parts, manning and time to implement the plan and conduct team meeting. - Keeps files of plans and record of equipment history such as...